The Energy Foundation
San Francisco, CA

BCCI worked closely with this client to realize their goals for their new headquarters at the historic Bently Reserve. Project scope included a full build-out with executive offices, conference rooms, meeting areas, kitchen and reception area where recycled and renewable materials were used throughout. Test build-outs were provided to ensure client satisfaction and LEED requirements. Achievements included ceiling panels with dimmable fluorescent lights and daylight harvesting sensors and new air conditioning and lighting systems that were integrated with the upgraded base building systems. The end result is both efficient and aesthetically pleasing. This was the first project in California to achieve the highly sought after LEED-CI Platinum certification.

ARCHITECT:
TannerHecht Architecture
PROJECT SIZE:
19,100 sf
DATE COMPLETED:
July 2008
LEED CERTIFICATION:
CI-Platinum